Data Center Phase I

A custom-built, shell-and-core data center located within the Krakatau Industrial Estate. Backed by GSI as sponsor and corporate guarantor, the landlord provides fully integrated building and MEP infrastructure for a single hyperscale tenant under a long-term, multi-tranche reimbursement lease structure.

80MW

Proposed Phase I Capacity

10 Years

Lease Term

5.7 ha

Phase I site within 20ha Master Site

1.25

Design PUE Target

*Headline target from the project proposal; the 80 MW headline, ~111 MVA intake and 100 MW IT-load assumptions require technical reconciliation. Proposed, not an operating facility.

Reasons Behind the Project

Why Cilegon?

⚡ Firm High-Voltage Power

Direct access to the adjacent PLTU Suralaya power complex and dedicated estate-level power/water infrastructure, capable of supporting extreme AI power densities (80–120 kW/rack).

🌐 Diverse Subsea Connectivity

Located ~30 km from Anyer’s subsea cable landing stations, offering low-latency, resilient routing for global and regional hyperscale traffic.

🛡️ De-risked Heavy-Industrial Estate

Situated inside the Krakatau Industrial Estate on contiguous industrial land—eliminating greenfield execution, zoning, and utility delivery risks.

📜 Onshore Data Residency

Fulfills all regulatory mandates for sovereign enterprise and government workloads under PP 71/2019 and the PDP Law.

🤝 Flexible Build-to-Suit Structure

Landlord-delivered shell, core, and MEP under a long-term lease with tranche-reimbursed capex, backed by GSI as sponsor and corporate guarantor.

3.56 GW

Indonesia’s data center load by 2030

+2.1 GW

to be built in 5 yrs

>250 MW

Wholesale colocation demand in Jakarta & Batam

USD 325m

BCA’s facility to Digital Edge in Oct 2025

Like what you see?